Underground 30,000 Litre Fuel Tank Module
Report Date: June 2022
GOSS Engineering was commissioned to design and build a 30,000 litre underground refuelling solution for a client in May 2022.
The custom Fuel Tank and Dispensing system was designed and built in our Cardiff Workshop then transported to site thanks to Wilson Crane Lifts.